| Route | Section | Date of work | Type of work | Obstacles | Comments |
|---|---|---|---|---|---|
| Billy-Diamond Highway | KM 67-72 | October 9, 2024 to May 30, 2026 | Replacement of a set of culverts with a bridge at KM 69.8 | Full closure and detour both directions; Speed reduction (30 km/h); Flagger to alternate traffic | Contact: Alain Andriamaro 873 995-2076 aandriamaro@sdbj.gouv.qc.ca |
| Billy-Diamond Highway | KM 98–100 | September 29 – October 30, 2025 | Pavement rehabilitation at KM 99 | Uneven road in places; Speed reduction and presence of flagger or escort vehicle; Speed 50–80 km/h | Contact: Alain Andriamaro 873 995-2076 aandriamaro@sdbj.gouv.qc.ca |
| Billy-Diamond Highway | KM 400–500 | October 6 2025 to July 31, 2026 | Mechanical clearing of roadside vegetation from KM 400 to Km 500 | None | Contact: Alain Andriamaro 873 995-2076 aandriamaro@sdbj.gouv.qc.ca |
| Route 113 | KM 126-192 | September 30 – October 31, 2025 | Pothole repairs, shoulder regrading, and localized paving | None | Contact: Manamba Keita mkeita@sdbj.gouv.qc.ca 873 995-5782 |
| Wémindji Road | KM 26-75 | August 29 – November 3, 2025 | Culvert and bridge repairs, paving, and granular resurfacing | Alternating traffic | Contact: Manamba Keita mkeita@sdbj.gouv.qc.ca 873 995-5782 |
| Route du Nord | KM 258-407 | September 2 – October 31, 2025 | Culvert and bridge inspections, culvert site characterization, and geotechnical drilling | None | Contact: Manamba Keita mkeita@sdbj.gouv.qc.ca 873 995-5782 |
| Route 167 | KM 323-341 | October 1 – November 30, 2025 | Granular resurfacing, guardrail upgrades, and signage installation | None | Contact: Abdellah Faris afaris@sdbj.gouv.qc.ca 873 995 6384 |