Roadwork

RouteSectionDate of workType of workObstaclesComments
Billy-Diamond Highwaykm 60 to km 63September 28, 2026 to October 30, 2028Road rehabilitation at km 61Full roadway closure
Reduced speed limit (between 30 and 70 km/h)
Traffic signals will control alternating traffic on the detour road
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Billy-Diamond Highwaykm 64 to km 69August 25, 2025 to September 30, 2028Replacement of a culvert battery with a bridge at km 66Full roadway closure
Reduced speed limit (between 30 and 70 km/h).
Traffic signals will control alternating traffic on the detour road
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Billy-Diamond Highwaykm 101 to km 105September 28, 2026 to October 30, 2028Road rehabilitation at km 103Full roadway closure
Reduced speed limit (between 30 and 70 km/h)
Traffic signals will control alternating traffic on the detour road
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Billy-Diamond Highwaykm 454 to km 456May 26, 2026 to September 30, 2028Culvert and guardrail rehabilitation workFull roadway closure, detour route in place
Reduced speed limit (between 50 and 70 km/h).
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Billy-Diamond Highwaykm 460 to km 538May 19, 2025 to September 30, 2027Road rehabilitation, culvert replacement and guardrail replacementRough road surface in some areas.
Reduced speed limit and presence of traffic controllers or pilot vehicles to control traffic.
Posted speed limits between 30 and 80 km/h.
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Billy-Diamond Highwaykm 538 to km 620June 8, 2026 to September 30, 2026Road rehabilitation, culvert replacement and guardrail replacementReduced speed limit and presence of traffic controllers or pilot vehicles to control traffic.
Posted speed limits between 30 and 80 km/h.
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Chisasibi Access Roadkm 3 to km 90May 18, 2025 to September 30, 2026Road rehabilitation, culvert replacement and guardrail replacementReduced speed limit and presence of traffic controllers or pilot vehicles to control traffic.
Posted speed limits between 30 and 80 km/h.
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
La Grande-3 Access Road (LG-3)km 0 to km 30May 8, 2026 to September 28, 2027Road rehabilitation, culvert replacement and guardrail replacementRough road surface in some areas.
Reduced speed limit and presence of traffic controllers or pilot vehicles.
Posted speed limits between 30 and 50 km/h.
Contact:
Alain Andriamaro
873 995-2076 aandriamaro@sdbj.gouv.qc.ca
Wemindji Access Roadkm 22 to km 65September 30 to November 6, 2026Granular resurfacing of the roadwayRough road surface in some areas.
Reduced speed limit and presence of traffic controllers or pilot vehicles to control traffic.
Posted speed limits between 30 and 50 km/h.
Contact:
Manamba Keita
873 95-5782
mkeita@sdbj.gouv.qc.ca
Route 167km 323 to km 342August 10 to October 2, 2026Granular resurfacing, guardrail upgrades and related workAlternating one-way traffic.
Reduced speed limits and traffic controllers or pilot vehicles present.
Contact:
Manamba Keita
873 95-5782
mkeita@sdbj.gouv.qc.ca